-
Two stage NOS
I picked up a Zex kit and I am thinking of making it a two stage, a 75hp shot at 2000 to 3500 to get it out of the hole then another 75hp shot added in at 3500 to shift point. If I were running a single stage system a push button would fill the need, but to keep things consistent and manageable, I think a controller is going to be needed. Has anyone used 2 of the MSD 8969 to control each stage? I know it will work for a single stage, any reason it would not work for a 2 stage?
Thanks
-
This is something I would like to know as well!! Someone chime in!
-
I have not used THAT system..............
I highly recommend the Jacobs Mastermind or the controller Cold Fusion offers.............
The Cold Fusion works on seconds into the run..............
So I would wire it like this; a WOT switch and a button to a relay.............this is for your initial 75shot.
Also attached to this relay is the Cold Fusion controller with a 1.5 second timer that you program into it...................the count down from 1.5 to 0 starts from the time to press the button for the first 75 shot.
This brings in the total 150 amount at about 3 seconds from initial launch.
Does this make sense to you?
Why I also like this is because if you let off the throttle or the button, it cuts 12V from the timer and no second shot comes in.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Share This Thread