From under the tower
From the roof of the tower
From about 100 feet past the stripe. The new left wall is up all the way to the end of the track. The right wall framing is starting to be put together.
From about 1200 feet past the stripe in the shutdown.
From the end of the track. Cap on the left lane wall is for where the road course is coming out of their turn. Right lane wall is beginning.
Return road paved. Just across from the light pole on the right will be the location of the scale.
![]()


LinkBack URL
About LinkBacks













Reply With Quote
Can't wait to get back on the track!!! It is looking great!!












Share This Thread